City Hospital, Belfast

The works at City Hospital were to replace a revolving entrance door and curtain wall with a new lobby with automatic sliding doors.  The building was live throughout the duration of the works and due to the nature of the building we kept disruption to minimum.

We utilised an alternative entrance door to the building for the duration of the works and constructed a hoarding complete with redirection signage inside while we carried out the work.