Queens University Belfast – MBC Borewell

Client: Queens University Belfast – MBC Borewell
M&E Value: 130K

Dowds Group completed works comprising of the installation of a new water treatment system with break tanks in the MBC Borewell Plant room, and the removal of existing booster sets and pumps. All associated Civil, Mechanical and Electrical works were included in this project.  A new HPPE pipe from the borehole into the new plant room was laid following associated excavation around the front of the building and back filling.  Disconnection of the existing mains water supply into the building and provision of a new mains water supply into the new tank room. All works were carried out when the building was occupied, so particular attention was required to separate all work areas from the Staff and Students who were attending the college.  All works were completed in a timely manner and the college grounds left in pristine condition.


External images of MBC Borewell courtesy of Felix O’Hare – www.felixohare.co.uk