Fully integrated all mechanical systems into a new Building Management System, enabling centralised monitoring and optimisation of plant performance
Deployed smart lighting controls with PIR detection and dimming, integrated with VAV ventilation systems to reduce energy consumption based on occupancy
Utilised a fully developed BIM model to resolve clashes in tight ceiling voids and existing structural limitations, ensuring installation accuracy.
Installed dedicated N+1 DX cooling systems and gaseous fire suppression within MER/CER rooms to provide resilience for critical IT infrastructure.
Utilised selective off-site prefabrication and just-in-time delivery to navigate constrained site storage, ensuring materials and assemblies arrived only when ready for immediate installation.