Project highlights
Installation of a 650kVA standby generator on the Level 10 roof to support life-safety systems, including firefighting and evacuation lifts, via local Automatic Transfer Switches.
Installation of a 650kVA standby generator on the Level 10 roof to support life-safety systems, including firefighting and evacuation lifts, via local Automatic Transfer Switches.



“A practical and coordinated approach allowed the team to manage the complexities of a restricted structural frame while maintaining a high standard of finish. Close engagement with the client and design team ensured the technical systems were delivered safely and in line with the college’s long-term sustainability goals.”
Julian McCamphill, Dowds